Information about VIN: WBS33BA07RCP56735 2024 BMW M4

Auction : iaai
Sale Date : 06.03.26

$

Specifications

Body
Body
Convertible
Make
Make
BMW
Transmission
Transmission
Automatic
Fuel Type
Fuel Type
Gasoline
Mileage
Mileage
25756 mil
Drive line
Drive line
All-Wheel Drive
Year
Year
2024
AC
AC
Air Condition
VIN
VIN
WBS33BA07RCP56735
Door
Door
4 Doors
Brake
Brake
ABS
Engine (Hp)
Engine (Hp)
3.0L I-6 DI, DOHC, VVT, turbo, 503HP

Lot Description

We present you with real-time data regarding the actual selling prices of salvage vehicles, including examples like WBS33BA07RCP56735 on iaai. The 2024 BMW M4, identified by the VIN WBS33BA07RCP56735, recently found its new owner through a successful auction on iaai. Delving deeper, this BMW M4 comes with a recorded mileage of 25756 miles, a detail that you can further authenticate using reputable databases such as Carfax and AutoCheck.

This specific vehicle, with the VIN WBS33BA07RCP56735, joined the auction due to sustained damage to its Front End. Despite this, the resilient spirit of salvage vehicles shines through, as the BMW M4 with the VIN WBS33BA07RCP56735 managed to secure a new chapter in its journey by being successfully sold on iaai's platform. The transaction marked the culmination of a deal that exchanged hands for a sum of .

Lot Details

  • VIN WBS33BA07RCP56735
  • Lot # 44418010
  • Make BMW
  • Model M4
  • Date 06.03.26
  • Primary Damage Front End
  • Retail value 71308
  • Odometer 25756 mil Actual
  • Title State/Type Salvage
  • Seller Insurance Geico Insurance
  • Year 2024
  • Auction iaai
  • Final Price $
  • Sale Status Sold
  • Drive line All-Wheel Drive
  • Run & drive Run & Drive

Similar Vehicles

New VINs

Explore in-depth automotive history and damage reports from Copart and IAAI on website